Commissioning - Rinnai Linear Series Installation Manual

Hide thumbs Also See for Linear Series:
Table of Contents

Advertisement

Commissioning

Accessing the commissioning instructions installed in the bottom of the unit will not normally
occur during installation, which is why the instructions are detailed in this guide.
For servicing and maintenance the commissioning sheet is installed in a pouch inside the base
panel of the appliance:
1500
right hand side of the gas control
800/1000 tucked in behind the Wi-Fi
The Linear comes with the high and low operating pressures factory preset. Under normal
circumstances the operating pressures do not require adjustment during installation. Make
adjustments ONLY if the unit is not operating correctly and all other possible causes for incorrect
operation have been eliminated.
Inlet supply pressure to the appliance MUST BE checked and set within the operating parameters
of the appliance in all instances. If the appliance cannot be adjusted to perform correctly call
0800 746 624.
240 V, risk of electrical shock
Before attempting to remove any panels ensure the fire is isolated from the mains
supply.
WARNING
DO NOT leave the appliance unattended when the power is connected and the panels are removed.
Commissioning requires the plastic buttons on the PCB are pushed. We do not recommend using
a screwdriver as breakage can occur, a blunt item or finger is best.
The gas pressures of the Linear are factory set for
All other installations, greater than 3 m in length, are long flue (L-F) installations and will require a
dip switch change.
20 | Linear installation guide 13563-B 02-19
ESWTERM
ASPDFK
ESPIPE900
ESWTERM
short flue
(S-F) installations, as pictured below.
45 ° bends
ESPIPE900
(cut down)
EVOKIT03
ESPIPE900
(cut down)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhfe1000sRhfe800sRhfe800dRhfe1000dRhfe1500dRhfe1500s

Table of Contents