Testing The Installation; Power-Up And Initial Test Procedure - Honeywell Ademco Accord Installation Instructions Manual

Table of Contents

Advertisement

AC
AC
BAT+
BAT–
GND
Stand-by Battery
Max 7.2 Ahr
MAINS AND BATTERY CONNECTIONS
+
BELL
BELL
TAMP
–R
STRB
CONNECTIONS FOR BELL AND STROBE

Testing the Installation

Power-up and Initial Test Procedure

When the Accord control panel has been installed in accordance with the preceding
safety and wiring instructions the system should be tested. The test procedure is
outlined below.
Note: Before the test commences all auxiliary devices such as powered sensors
(PIRs), remote keypads, alarm sounders, etc, must be connected.
The Stand–by battery should not be connected at this point.
Live
Earth
Neutral
Primary
AC Mains transformer
Secondary
+
+
c
n/o
n/c
+
BELL
BELL
TAMP
+
–R
STRB
Figure 2.4 Connections to the Accord.
ZONE
ZONE
ZONE
ZONE
ZONE
TAMP
1
1
2
3
ZONE WIRING
Normaly closed (Open for zone activation)
F1 Battery: 1 A, 20 mm Anti-surge
F2 Keypad/Auxiliary: 500 mA, 20 mm Anti-surge
F3 Bell: 500 mA, 20 mm Anti-surge
Mains Fuse: 100 mA, 20 mm Anti-surge
FUSE RATINGS
+
AUX
LS
TRIG
K'PAD
+ Supply/Hold-off
Trip/Signal Negative
– Supply/Hold-off
– Tamper return
Strobe – signal
CONNECTIONS FOR SAB
10
ZONE
ZONE
ZONE
ZONE
ZONE
4
5
6
8
7
16 Ω
kpad
ZONES
FULL
PART
SET
SET
+ve
1
1
2
2
TEST
ISOLATE
–ve
3
4
5
4
CODE
5
7
8
6
ESCAPE
LOG
EASY SET
7
0
8
TAMPER
DAY
POWER
KEYPAD AND
LOUDSPEAKER WIRING
NIGHT
SET
3
6
CHIME
9
#

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents