Testing the Installation
Power-up and Initial Test Procedure
When the Accord control panel has been installed in accordance with the preceding
safety and wiring instructions the system should be tested. The test procedure is
outlined below.
Note: Before the test commences all auxiliary devices such as powered sensors
(PIRs), remote keypads, alarm sounders, etc, must be connected.
The Stand–by battery should not be connected at this point.
Live
Earth
Neutral
Primary
AC Mains transformer
Secondary
+
+
–
c
n/o
n/c
+
BELL
–
–
BELL
TAMP
+
–
–R
STRB
Figure 2.4 Connections to the Accord.
ZONE
ZONE
ZONE
ZONE
ZONE
TAMP
1
1
2
3
ZONE WIRING
Normaly closed (Open for zone activation)
F1 Battery: 1 A, 20 mm Anti-surge
F2 Keypad/Auxiliary: 500 mA, 20 mm Anti-surge
F3 Bell: 500 mA, 20 mm Anti-surge
Mains Fuse: 100 mA, 20 mm Anti-surge
FUSE RATINGS
+
AUX
–
LS
TRIG
K'PAD
+ Supply/Hold-off
Trip/Signal Negative
– Supply/Hold-off
– Tamper return
Strobe – signal
CONNECTIONS FOR SAB
10
ZONE
ZONE
ZONE
ZONE
ZONE
4
5
6
8
7
16 Ω
kpad
ZONES
FULL
PART
SET
SET
+ve
1
1
2
2
TEST
ISOLATE
–ve
3
4
5
4
CODE
5
7
8
6
ESCAPE
LOG
EASY SET
7
0
8
TAMPER
DAY
POWER
KEYPAD AND
LOUDSPEAKER WIRING
NIGHT
SET
3
6
CHIME
9
#