System Connection - Dop Interface - Renishaw TONiC FS T301 Series Functional Safety Manual

High accuracy linear encoder system
Table of Contents

Advertisement

Disconnecting the readhead
Remove the cover plate on the interface
1
(2 × M2.5 hex head screws).
Gently lever the connector PCB (on the
2
end of the cable) out of the socket.
Do not pull the cable to remove the
connector.
3
Place the connector in an anti-static bag.
4
Refit the cover plate.
TONiC RSLM20/RELM20 Functional Safety installation guide and safety manual
System connection – DOP interface
Approved ESD precautions must be followed at all times during readhead and interface electrical
connections.
The readhead is connected to the DOP interface via a small, rugged PCB connector to allow for easy
feed-through during installation.
Connecting the readhead
Remove the cover plate on the
1
interface (2 × M2.5 hex head screws).
Taking care not to touch the pins,
2
plug the connector into the socket
in the interface, ensuring correct
orientation as shown.
3
Refit the cover plate ensuring the
cable ferrule is located in the recess
on the inside and no wires are
trapped under the cover plate.
DOP mounting
The DOP interface readhead is mounted to a suitable surface using customer-supplied screws appropriate
to the application details.
NOTES:
X
Recommended screw type M3 × 0.5 and must comply with:
ISO 4762/DIN 912 grade 8.8 minimum/ANSI B18.3.1M.
X
No washer is required under the screw head.
X
Minimum thread engagement 6 mm.
X
Tightening torque 0.9 Nm to 1.1 Nm.
X
The DIN rail mounting where used must comply with EN 50022.
Disconnecting the readhead
1
Remove the cover plate on the interface (2 × M2.5 hex head screws).
2
Gently lever the connector PCB (on the end of the cable) out of the socket.
3
Place the connector in an anti-static bag.
4
Refit the cover plate.
Original instructions
Cover plate
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tonic relm20Tonic rslm20

Table of Contents