Scale installation
NOTE: Ensure the guidance in
'Storage and handling' on page 5
1
Thoroughly clean and degrease
the substrate with a
lint-free cloth.
Clean underside of scale using approved solvents
(see 'Storage and handling' on page
5).
4
Thoroughly mix and apply epoxy then remove
remaining backing liner.
Area for RGG-2 epoxy
(A-9531-0342)
5
Locate scale against dowels or ledge
and rotate down onto substrate.
Press down with firm finger
pressure.
TONiC RSLM20/RELM20 Functional Safety installation guide and safety manual
is followed.
2
Mark area for epoxy on
adhesive tape.
6
Support
dowels
Mounting ledge
Original instructions
3
Remove backing liner from one side
and stick to underside of scale.
7
8
or
Allow 24 hours for epoxy to cure fully, then
clean scale using Renishaw scale wipes
(A-9523-4040) or a clean, dry, lint-free cloth.
Remove excess
epoxy
9