Start/Stop Levels - Watts Aerco Benchmark Series Operation And Service Manual

Platinum boilers with edge controller
Hide thumbs Also See for Aerco Benchmark Series:
Table of Contents

Advertisement

Benchmark Platinum-Edge: Operation-Service Manual
SECTION 3 - START SEQUENCE

3.3 START/STOP LEVELS

The start and stop levels are the Air/Fuel Valve positions (% open) that start and stop the unit,
based on load. These levels are Factory preset as follows:
TABLE 3-1a: Start/Stop Levels – NATURAL GAS
BMK
750
Start
22%
Level:
Stop
18%
Level:
Ignition
35%
Position
TABLE 3-1b: Start/Stop Levels – PROPANE GAS
BMK
750
Start
22%
Level:
Stop
18%
Level:
Ignition
35%
Position
Normally, these settings do not require adjustment.
Note that the energy input of the boiler is not linearly related to the Air/Fuel Valve position.
OMM-0137_D
• GF-211 •
7/16/2019
BMK
BMK
BMK
1000
1500
2000
22%
20%
24%
18%
16%
18%
35%
29%
29%
BMK
BMK
BMK
1000
1500
2000
22%
20%
24%
18%
16%
18%
35%
29%
29%
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
BMK
BMK
BMK
2500
3000
5000
24%
20%
24%
16%
14%
18%
29%
29%
35%
BMK
BMK
BMK
2500
3000
5000
26%
22%
24%
18%
14%
18%
29%
29%
35%
BMK
6000
24%
18%
50%
BMK
6000
24%
18%
50%
Page 23 of 146

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF