Operation Details - Watts Aerco Benchmark Series Operation And Service Manual

Platinum boilers with edge controller
Hide thumbs Also See for Aerco Benchmark Series:
Table of Contents

Advertisement

Benchmark Platinum-Edge: Operation-Service Manual
SECTION 9 – AERTRIM OPERATION
AERtrim Activation Instructions
1. Record the following information from the unit you wish to activate. To do this, go to the
Main Menu  Advanced Setup  Performance  AERtrim  AERtrim Settings and
scroll down until you see the following parameters:
Unit Serial #, found on the unit's code plate. For example, G-18-1050
Trim ID
Fixed ID
2. Contact AERCO Sales Administration with the information found in step 1. They will
provide you with an activation code.
3. Once you have obtained the activation code, go back to Main Menu  Advanced Setup
 Performance  AERtrim  AERtrim Settings.
4. Find the Activation Code parameter, enter the activation code and press Save.
5. Scroll back to the top of the AERtrim Settings screen and set the AERtrim parameter to
Enabled.
Go to the AERtrim  O2 Trim Parameters screen. The O2 Target, O2 Upper Limit and
6.
O2 Lower Limit parameters are at default values but can be changed as needed.
NOTE: For full instructions, including all menu options, see the Edge Controller Manual,
Section 6.6.1: AERtrim.

9.3 OPERATION DETAILS

During operation, the AERtrim system will adjust the command voltage sent to the combustion
air blower within a limited range. The amount of voltage trim depends on the error between the
desired O
% (target %) and the current reading of the O
2
low limits of blower voltage for each valve position. The total amount of corrective voltage trim
is limited by the controller to insure safe and reliable operation of the system.
The AERtrim system has a rolling active/inactive operation based on 4 hours on / 10 hours off
sequence. Since this is a trim function and not an active control function, the trim activity can
make adjustments in the blower voltage calibration values on the 4/10 schedule to effectively
control the air/fuel mixture without continuous operation of the sensor. This method achieves
the objective for long term efficiency of boiler operation while maximizing the sensor life in the
boiler environment. The 14 hour cycle insures that the 4 hour on period will be active for any
hour of the day every four days as shown below.
Figure 9-2: Active O
OMM-0137_D
• GF-211 •
7/16/2019
2
Sensor Cycle Coverage Chart
2
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
sensor (O
%) and also on high and
2
Page 120 of 146

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents