Returning The Boiler To Service After Shutdown - Watts Aerco Benchmark Series Operation And Service Manual

Platinum boilers with edge controller
Hide thumbs Also See for Aerco Benchmark Series:
Table of Contents

Advertisement

Benchmark Platinum-Edge: Operation-Service Manual
SECTION 8 – MAINTENANCE

8.12 RETURNING THE BOILER TO SERVICE AFTER SHUTDOWN

After a prolonged shutdown (one year or more), the following procedures must be followed:
Placing The Boiler Back In Service After A Prolonged Shutdown Instructions
1. Review installation requirements included in Section 2 of the Benchmark Platinum-Edge:
INSTALLATION Manual (GF-210).
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent and air inlet duct work (if applicable).
4. Perform initial startup per Section 4 of this guide.
5. Perform the instructions in Section 5: Safety Device Testing, above, and all scheduled
procedures described Section 8: Maintenance.
OMM-0137_D
• GF-211 •
7/16/2019
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 115 of 146

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents