2.2.1.2
Grounding
The system is shipped with grounding-type (three-wire) power cords. Always
connect the cords into grounded power outlets. Contact your facilities manager or a
qualified electrician to determine what type of power is supplied to your building.
No additional earth grounding is necessary but it may be added if desired.
2.2.2
Cable Connections
TABLE 2-3
TABLE 2-3
System
SPARC Enterprise
M4000
Connector
SPARC Enterprise
M5000
Connector
Refer to the SPARC Enterprise M4000/M5000 Servers Site Planning Guide for electronic
specifications of the midrange servers.
2.2.3
Checking the Installation Location
When installing the server, consider not only the device sizes but also the sizes of the
required service areas (maintenance areas). For details, refer to the SPARC Enterprise
M4000/M5000 Servers Site Planning Guide and the manual that came with the rack.
The site electrician should verify the proper electrical hookups.
2-8
SPARC Enterprise M4000/M5000 Servers Installation Guide • November 2008
lists the powercords for the servers.
Power Cords
Location
Americas, Taiwan
Server
Korea, Japan
Rest of the world
Americas, Taiwan
Server
Korea, Japan
Rest of the world
Powercord type
NEMA L5-15 125V 15A
NEMA L6-20 250V 20A
IEC60309 16A 250V, 3PIN with IEC60320
C20
NEMA L5-15 125V 15A
NEMA L6-20 250V 20A
IEC60309 16A 250V, 3PIN with IEC60320
C20