Performance Test Results - Siemens interranger DPS300 Instructional Manual

Table of Contents

Advertisement

Performance Test Results

Monitor system performance carefully, under all anticipated operating conditions.
A. If the DPS300 performs exactly as required, copy all Parameter Value alterations
to the PROGRAMMING CHARTS in the back of this instruction manual. (Altered
Parameter Values may be scroll accessed). No further action is required.
B. If a measurement difficulty is encountered (the "LOE" display persists after start
up), or performance does not meet installation requirements, proceed to the
TROUBLESHOOTING GUIDE
C. If the DPS300 provides accurate and repeatable measurements, however
alternate Reading units, failsafe action, relay, or mA output operation is desired,
proceed to APPLICATION PARAMETERS.
If all operating conditions cannot be observed during the System Performance
Evaluation, refer to ENHANCEMENT PARAMETERS / Reading Measurement
(P920). Perform a Reading Measurement simulation to verify programming.
Ensure the PROGRAMMING CHARTS are altered accordingly, and a new System
Performance Evaluation is conducted, following any operation alteration or
measurement difficulty remedy.
Note:
Connect (or enable) process control / alarm equipment to the DPS300 only after
satisfactory performance is verified for all possible operating conditions.
InterRanger DPS300
.
52
7ML19981BC01

Advertisement

Table of Contents
loading

Table of Contents