17
First switch-on
17.1
Battery charging module E3C011
17.2
Control terminal B3Q700 ('FC'/'FT')
Building Technologies
Fire Safety & Security Products
1. Check whether the batteries are connected.
2. Apply mains voltage, observe the safety regulations in Chapter 2
The stations 'FC'/'FT' load a basic configuration stored in Flash into the RAM.
–
After approx. 2 min., this start-up procedure is concluded.
Green LED 'H501-2' (2) 'Mains operation' lights up.
E3C011
H501-2
2
The LCD display indicates the following 'NOTE' (information):
Information
******** load data ********
'FT' and 'FC' only communicate with each other after the system configuration
has been loaded into the stations.
The control unit is ready for the localization of SynoLOOP devices, or for the
data transfer from the maintenance PC.