4
Commissioning
4.1
Commissioning the system
Connection cable from mains, series fuse
≤
10A / IEC950 10 kg strain relief
PG11 screwed cable gland
Building Technologies
Fire Safety & Security Products
Requirements: The following work must be completed
1. Control unit installed and detection lines ready for connection (1).
2. All devices such as detectors, manual call points etc. connected and inserted
3. Peripheral devices such as control terminal (3), floor repeater panel, parallel in-
dicator panel, etc. installed and ready for connection.
4. SynoLOOP addressable detection lines have been tested with line tester
DZ1131.
5. Required hardware inserted (modules, module chassis, accessories, terminal,
possibly EPROM-set (E3H020), batteries).
Required tools
System documentation
Multimeter
Soldering iron (for re-soldering jumpers and resistors if required)
No. 1 long-shafted Philips head screwdriver for installing the module chassis
2 mm Allen key for installing the manual call points
ESD protection mat
2
1
3
Commissioning
13
007828_b_en_--
09.2008