Install the Edge Switch on a desktop

To install and configure the switch on a desktop:
1.
Remove the backing from the four adhesive rubber pads and apply the pads to the underside of
the switch. Ensure that the pads are aligned with the scribed circles at each corner.
2.
Position the switch on a table or desktop as directed by the customer. Ensure:
• Grounded AC electrical outlets are available.
• Adequate ventilation is present.
• Areas with excessive heat, dust, or moisture are avoided.
• All planning considerations are met. Refer to the HP StorageWorks HA-Fabric Manager user
guide.
3.
Verify that all FRUs are installed as ordered.
4.
Verify that the SFP optical transceivers are installed as required for your installation.
5.
Connect the U.S. or country-specific (optional) AC power cords to the right (PS0) and left (PS1)
receptacles at the rear of the chassis.
WARNING!
electric shock when connecting the switch to primary facility power, use only the supplied power
cords, and ensure that the facility power receptacle is the correct type, supplies the required
voltage, and is properly grounded.
6.
Connect the remaining ends of the AC power cords to separate facility power sources that
provide single-phase, 120 to 240 volt alternating current (VAC). This provides power
redundancy.
Turn on the power. Two power switches are on the back of the unit. Turn on both switches. The
7.
unit powers on and performs power-on self-tests (POSTs). During POSTs:
a. The green power (PWR) LED on the front panel turns on.
b. The amber system error (ERR) LED on the front panel flashes momentarily while the switch is
tested.
c. The green LEDs associated with the Ethernet port flash momentarily while the port is tested.
d. The green and amber LEDs associated with the ports flash momentarily while the ports are
tested.
8.
After successful POST completion, the green power (PWR) LED remains on and all other front
panel LEDs turn off.
9.
If a POST error or other malfunction occurs, refer to the HP StorageWorks Edge Switch 2/32
service manual to isolate the problem.
IAn HP-supplied power cord is provided for each switch power supply. To prevent
Edge Switch 2/32 installation guide
25

Advertisement

Table of Contents
loading

Table of Contents