Remote Installation Steps (Overview) - Polycom SpectraLink 6300 MCU Install Manual

Remote module installation
Hide thumbs Also See for SpectraLink 6300 MCU:
Table of Contents

Advertisement

Remote Installation Steps (Overview)

PN: 1725-36126-001_K.doc
Follow these steps to install the T1 Remote Module. Detailed
instructions for each of these steps are contained in this document and
other relevant documents in the SpectraLink 6300 MCU System
documentation.
1. Prepare site and check components.
2. Install T1 Remote Module at the local site (location where the
Primary Shelf is located.)
3. Connect T1 Remote Module at the local site to the Intershelf
Junction Panel and T1 facilities.
4. Install Expansion Shelf at remote site.
5. Install T1 Remote Module, Shelf Controller, and Interface
Modules at remote site. Note that GPS timing may be required
when remote and main shelves are within 600 to 800 feet of one
another.
6. Connect T1 Remote Module at the remote site to the Shelf
Controller and T1 Facilities.
7. Install any additional Expansion Shelves at remote site, and
connect Expansion Shelves at the site.
8. Connect RJ-21 cables for telephone lines and Base Stations to
Interface Modules at remote site.
9. Configure remote system and register handsets.
Remote Installation Overview
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SpectraLink 6300 MCU and is the answer not in the manual?

Questions and answers

Table of Contents