Install System at Remote Site
Survey Site
Install Shelves
PN: 1725-36126-001_K.doc
Check the site to be sure pre-installation work has been completed
correctly. This includes:
Location chosen for the shelves is adequate.
Rack (if rack mounted) is properly secured or backboard (if wall
mounted) is properly prepared.
Power is available.
Wiring to Base Station locations has been pulled and correctly
terminated.
Phone lines for the Wireless Telephones are installed and properly
terminated.
Telephone system administrator is available to program the
existing telephone system.
Rack mount
To install shelves in the rack, slide the shelves into the rack and secure
them to the rack using eight screws, 1/4" minimum length.
Wall mount
At this point in the installation process, there should be a backboard
securely fastened to the wall and mounting screws partially inserted
into the backboard. See SpectraLink 6300 MCU: Installation for more
information.