Check Components
PN: 1725-36126-001_K.doc
•
From the CSU, the T1 circuit must be provided to the SpectraLink
system on an RJ-48C modular connector.
•
The CSU must have an independent power supply, per
manufacturer specifications.
The following items should be at the installation site.
Cables Two 12-foot RJ-45 cables with each Expansion Shelf
Controller (CSC300). RJ-45 cable to connect multiple shelves (one
for each shelf).
Interface Modules The correct number and type of Interface
Modules to connect the handsets and the Base Stations to the
telephone system. Interface Modules can support analog
(CPA316), Universal digital (CPU316), Mitel (CPM316), Executone
(CPB316), Panasonic (CPP316), and select four-wire (CPF316)
interfaces.
Site Preparation
13