Event Log Screen; Measurements Screen; Commands Screen - ABB Conceptpower DPA 500 User Manual

480v ul – modular ups, 100kw – 3 mw
Hide thumbs Also See for Conceptpower DPA 500:
Table of Contents

Advertisement

7.5.8

Event Log Screen

DESCRIPTION
1 Logging Control; a log of the last 99 events is stored in the Power
Management Display.
2 Every stored event is identified with a sequential number and time
stamp.
3 By press ENTER the code of the event will be displayed. (Press
ENTER to come back to the previous indication)
4 All events and alarms are indicated with their date and time of
appearance.
7.5.9

Measurements Screen

DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

7.5.10 Commands Screen

42 Conceptpower DPA 500 480V UL │94-12-043275 A02
Battery Runtime
UPS-Output Frequency
Bypass Frequency
Battery Voltage
Battery Charger Current
Discharge Current
Rectifier Voltage of all three phases
Bypass Voltage of all three phases
Output Voltage of all three phases
Output Current of all three phases
Active Output Power of all three phases
Reactive Output Power of all three phases
Apparent Output Power of all three phases
Output Power of all three phases
Battery capacity
Battery temperature
Booster (BST) / Inverter (INV) temperatures
DESCRIPTION
1 Transfer Load to inverter
2 Transfer Load to bypass
3 Battery Test
4 Deep battery test
5 Abort battery test
LCD-DISPLAY
01
LOCAL LOAD OFF
02
LOCAL LOAD TO BYP
03
LOCAL LOAD TO INV
04
05-10-08
LOCAL LOAD TO INV
LCD-DISPLAY
BATT. RUN TIME (MIN)
00h 00m
OUTPUT FREQUENCY (HZ)
50.00
BYPASS FREQUENCY (HZ)
50.00
BATTERY VOLTAGE (V)
+ 0.0
BATT. CHARGE CUR. (A)
+ 0.0
DISCHARGE CURRENT (A)
00.0
RECTIFIER VOLTAGE (V)
230
230
BYPASS VOLTAGE (V)
230
230
OUTPUT VOLTAGE (V)
230
230
OUTPUT CURRENT (A)
00.0
00.0
ACTIVE POWER (KW)
00.0
00.0
REACTIVE POWER (kVAr)
00.0
00.0
APPARENT POWER (KVA)
00.0
00.0
OUTPUT POWER (%)
00
00
BATT. CAPACITY (%)
00
BATTERY TEMPERATURE
00.0
MODULE TEMP BST/INV
00.0
00.0
LCD-DISPLAY
 LOAD TO INVERTER
LOAD TO BYPASS
 LOAD TO BYPASS
PERFORM BATT.TEST
 PERFORM BATT.TEST
PERF. DEEP BATT.TEST
 PERF. DEEP BAT. TEST
ABORT BATT. TEST
 ABORT BATT. TEST
PERFORM ALARM TEST
05-10-08
14:38:59
05-10-08
14:38:56
8104
14:37:14
230
230
230
00.0
00.0
00.0
00.0
00
00.0

Advertisement

Table of Contents
loading

Table of Contents