5

UPS System Installation and Wiring

Installation should be performed only by authorized personnel.
DANGER
5.1

Preliminary Installation

Refer to the following while planning/installing the UPS system:
 Section 3.3 for cabinet dimensions, weights, and installation notes.
 Do not tilt the cabinet more than +/- 10 degrees during installation.
 Remove gland plates to add conduit landing holes as necessary. See outline drawing for plate material details.
5.2

Unpacking

Prior to unpacking, make sure that the floor surface is solid and suitable for supporting the weight of all the equipment. The UPS cabinet
is bolted to a wooden pallet supported by wood skids.
UPS AND BATTERY CABINETS ARE HEAVY AND TALL. MAKE SURE YOU ARE ALWAYS WORKING
SAFELY BY USING APPROPRIATE TOOLS AND EQUIPMENT. WHEN MOVING THE UNITS AROUND
USING FORKLIFT, ALWAYS MAKE SURE THE UNITS ARE IN UPRIGHT POSITION AND MOVE AT
WARNING
LOW VELOCITY/ACCELERATION.
DPA 500 EQUIPPED WITH 1-2 MODULES HAVE THE COG IN THE MIDDLE OR CLOSE TO IT,
WHEREAS A DPA 500 WITH 3-5 MODULES HAS IT SHIFTED TO THE SIDE.
Perform the following steps to unpack the UPS equipment from the standard packaging:
1.
Bring the unit(s) close to their final location.
2.
Unfasten the clamping feet from the pallet and from the unit.
3.
Using a forklift, remove the unit from the pallet, paying attention to the COG (see the warning above), and position the unit in its
final location.
4.
Remove the plastic film from the UPS, by cutting it on one edge (where there is the cardboard underneath). Remove the 4x
cardboard edges carefully; ensure that the accessory box placed on top of the UPS does not fall down. Remove the accessory
box from the top of the cabinet using appropriate method in accordance with applicable safety standards.
5.3

Positioning of the UPS and Battery Cabinet

The UPS is designed for location in a restricted access location only and should be located where:
 The relative humidity does not exceed 95% (non-condensing) and the temperature remains always between 0°C and +40°C. Note:
an optimal temperature for the UPS and especially for VRLA batteries is 20°C- 25°C. The UPS room shall have temperature control
(air-cooling)
 Location should be free of dust/debris sources and/or corrosive/explosive gases
 All local and national fire protections standards shall be followed.
 The location should be free of regular exposure to shock and/or vibration.
 The floor material should be non-flammable and strong enough to support the heavy load.
 The locations should be convenient for all cabling operations.
 The location should afford a front panel access of 36 inches from front of the unit for maintenance or service
 If the UPS will be installed in bayed enclosures, partition walls have to be installed as well
 Follow all clearance requirements (refer to Tables 5 and 6 and Figures 3 and 4 below) to allow proper airflow to the UPS cabinet.