SUN2000-(33KTL, 36KTL, 40KTL)-US
User Manual
Step 3 Remove the cable terminal base from the terminal block. Connect the communications cables
to the terminal base.
Figure 5-44 Connecting cables to a terminal base
(1) RS485A IN
(3) RS485B IN
Step 4 Install the terminal base on the terminal block, and connect the shield layers to the ground
point.
Figure 5-45 Connecting communications cables
Issue 07 (2019-06-20)
When connecting the shielded cables, choose whether to crimp the OT terminal based on site
requirements.
Copyright © Huawei Technologies Co., Ltd.
(2) RS485A OUT
(4) RS485B OUT
5 Connecting Cables
76