SUN2000-(33KTL, 36KTL, 40KTL)-US
User Manual
Figure 5-15 Connecting the AC output power cable (including the ground cable and neutral wire)
Step 5 Connect the conduit and fittings of the pipe.
Step 6 Check that the cables are connected correctly and securely. Then take appropriate measures to
ensure that the pipe conduit and fittings are secured reliably, and seal the cable holes.
Step 7 Secure the AC filter using screws.
Step 8 Clear foreign matter from the maintenance compartment.
----End
5.4.2 Common Connection
Prerequisites
The AC output power cable and OT terminal are available.
Issue 07 (2019-06-20)
The cable colors in figures are for reference only. Select appropriate cables according to the local
standards.
Use a cable that can withstand 90° C (194° F) or 105° C (221° F). To facilitate the
installation, you are advised to use cords.
If you connect a ground cable to the PE point on the chassis shell in the scenario with no
neutral wire, you are advised to use a three-core (L1, L2, and L3) outdoor cable.
If you connect a ground cable to the PE point in the maintenance compartment in the
scenario with no neutral wire, you are advised to use a four-core (L1, L2, L3, and PE)
outdoor cable.
Copyright © Huawei Technologies Co., Ltd.
5 Connecting Cables
54