SUN2000-(33KTL, 36KTL, 40KTL)-US
User Manual
Figure 5-20 Five-core cable (including the ground cable and neutral wire)
Step 2 Prepare the OT terminal.
Step 3 Route the cable through the waterproof connector.
Figure 5-21 Routing cables
Step 4 Connect the AC output power cable and secure it using a socket wrench that has an extension
rod.
Issue 07 (2019-06-20)
Copyright © Huawei Technologies Co., Ltd.
5 Connecting Cables
58