Common Support-Mounted Installation - Huawei SUN2000-33KTL-US User Manual

Hide thumbs Also See for SUN2000-33KTL-US:
Table of Contents

Advertisement

SUN2000-(33KTL, 36KTL, 40KTL)-US
User Manual
Figure 4-15 Securing a mounting bracket
----End

4.5.2 Common Support-mounted Installation

Procedure
Step 1 Determine the positions for drilling holes using the mounting bracket. Level the hole positions
using a level, and mark the hole positions using a marker.
Figure 4-16 Determining hole positions
Step 2 Drill holes using a hammer drill.
Issue 07 (2019-06-20)
You are advised to apply anti-rust paint on the hole positions for protection.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-36ktl-usSun2000-40ktl-us

Table of Contents