Operation; Training The Operating Personnel; Emergency Stop; Tasks - WAGNER Zip 52 Finishing Operating Manual

Pneumatic double diaphragm pump spraypack
Hide thumbs Also See for Zip 52 Finishing:
Table of Contents

Advertisement

VERSION 11/2018
7

OPERATION

7.1

TRAINING THE OPERATING PERSONNEL

The operating personnel must be qualified to operate the entire system.
The operating personnel must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2

EMERGENCY STOP

In the case of unforeseen occurrences:
– Immediately close the air cut-off valve (4).
ZIP 52 Finishing: An air cut-off valve is installed.
ZIP 52 PF Eco-Finishing: An air cut-off valve must be provided by the user.
– Open the return valve (5) and/or the delivery devices (valves or guns).
7.3

TASKS

Ensure that:
commissioning is carried out in accordance with Chapter 6.7.
1. Visual check:
personal safety equipment, grounding and all devices
ready to use.
2. Secure spray gun and insert nozzle into the spray gun.
3. Slowly open the shut-off valve (4).
4. The pump supplies the product (8) while the spray gun
(9) is open.
5. Set the air pressure to 1–1.5 bar with the pump pressure
regulator (1) and the product pressure regulator (2, for
ZIP 52 Finishing), in order to reach the desired product
amount and/or the desired product pressure.
6. Set the atomizing air pressure regulator (3) to 1.5–2 bar.
7. Start work process.
ORDER NUMBER DOC 2332848
Zip 52 Finishing
9
2
1
8
closed
open
6
5
4
7
3
5
9
6
7
3
1
8
B_06949
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zip 52 pf eco-finishing

Table of Contents