Conveyor Service
Grease Conveyor Bearings
Grease the conveyor bearings every 10 hours of operation and before storage. Use only two pumps of grease per bearing.
NOTE: Excess lubrication of these bearings will result in premature failure.
NOTE: The conveyor has four bearings that need grease (two at each end).
Grease Point
Grease Swing Arm
Grease pivot points on boom arm every 50 hours and before storage.
Grease Points
21