Valve Wiring - J&M SpeedTender LC290 Operator's Manual

Table of Contents

Advertisement

Use a good set of Allen wrenches when changing orifices.
The cartridge should be tightened with 25 ft-lbs of torque.
The coil nut should be tightened with 5 ft-lbs of torque.
There is a spring, poppet valve, and ball bearing at the bottom of each coil.
The top coil operates the bottom port.
The bottom coil operates the top port.
When changing cartridge make sure all functions are at rest.
The lettering on the coils should always be facing up.

Valve Wiring

P
E
N
D
F
M
A
C
G
L
B
H
K
J
Connector
Letter
Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
Letter
Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Speedtender lc390

Table of Contents