Lubrication Service Schedule - J&M 1522 Series Operator's Manual

Grain cart
Hide thumbs Also See for 1522 Series:
Table of Contents

Advertisement

IMPORTANT: Your grain cart has grease fittings at all critical points. These should be serviced before the grain cart is put into operation.
WARNING
BE CERTAIN THAT ALL POWER IS SHUT OFF BEFORE SERVICING THE GRAIN CART
PTO & DRIVELINE: The grease fittings on the PTO should be serviced after every 8 hours of use. Service the grease fittings on each of
the drive bearings and also the universal joint after every 8 hours of use.
AUGER FOLDING MECHANISM: One grease fitting is located on the pivot pin of the folding auger. This fitting should be serviced after
every 8 hours of use. Service the grease fitting on the hanger bushing assembly (top end of the lower auger assembly) after every 8
hours of use or as needed.
SPRING LOADED UPPER AUGER BEARING: Service the grease fitting on the upper auger bearing (1 pump) (located at the top end of
the upper auger assembly) after every 8 hours of use. Lubricate the springs and retaining bolts on the bearing before prolonged storage
of the grain cart.
Grease Fittings
Pivot Pin
Once Annually
Roll Tarp U-Joint
Once Annually
Upper Auger Flighting
Every 8 hrs of use
Driveline
Every 8 hrs of use
GEARBOX: Gearbox lubricant has been added to the gearbox during final assembly. Recheck the lubricant level before initial operation of
the grain cart, then periodically according to use. The fluid level should rest at the inspection plug, pictured in blue below. When filled to
the proper level, the gearbox should have 96 ounces of SAE 80W-90 lubricant. Change the oil annually before use.
14

Lubrication Service Schedule

Gearbox Lubricant
Model
Ounces
Input Shaft
1522
96
1-3/4"
Output Shaft
2"

Advertisement

Table of Contents
loading

Table of Contents