Taylor PH61 Operator's Manual page 32

Heat treatment peristaltic pump shake freezer
Hide thumbs Also See for PH61:
Table of Contents

Advertisement

Step 10
Lubricate the smaller end of the driven spinner.
(See Figure 17.)
Figure 17
Step 11
Squeezing the split end together, insert the driven
spinner through the metal opening of the draw valve
until it snaps into place. (See Figure 18.)
Figure 18
Step 12
Lubricate the inside of the freezer door spout, top
and bottom. (See Figure 19.)
Operating Procedures
Step 13
Insert the draw valve spinner assembly from the
bottom until the slot in the draw valve which accepts
the draw handle comes into view. (See Figure 20.)
Step 14
Install and lubricate the pivot pin o-ring.
(See Figure 21.)
28
Figure 19
Figure 20
Figure 21
PH61 Peristaltic Pump

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PH61 and is the answer not in the manual?

Table of Contents