General Safety Instructions
1.5 Staff
1.5.1 Instructions regarding the staff
Regarding the staff, there are basically two starting situations to be considered.
•
activities during the training operation
•
activities not connected with the training operations.
1.5.2 Training operations
The trainees are only allowed to work on the machine if supervised by a skilled person or the instructor.
Any activities concerning fault finding and elimination are controlled by the instructing person.
Safety regulations have to be observed here in particular.
1.5.3 Beyond training operations
All activities concerning maintenance, servicing and repair may only be executed by a person with
sufficiently professional qualifications.
1.6 Commitment of the operator
The operators commit themselves to only allowing the work at the CP-Factory/ CP-Lab to a person who:
•
is familiar with the principle directions of work safety and accident prevention and has been instructed
in the handling of the CP-Factory / CP-Lab,
•
has read and understood the safety chapter and the warnings in this manual.
The safety-conscious working of the staff should be checked at regular intervals.
1.7 Commitment of the trainees
Before they start work, all persons in charge of works at the system commit themselves to:
•
read the safety chapter and the warnings in this manual,
•
observe the basic principles about work safety and accident prevention.
10
© Festo Didactic CP Factory / CP Lab ° MR Buffer and palletizing robot