Overview of Start-Up Procedures
The following table lists the things you will need to do before you can use
this board, and tells where to find the information you need to perform each
step. Be sure to read this entire chapter and read all Caution and Warning
notes before beginning.
What you need to do ...
Unpack the hardware.
Set jumpers on the MVME2300
module.
Prepare the PMCs.
Prepare the PMCspan module(s).
Prepare any other optional devices or
equipment you will be using.
Install the PMCs on the MVME2300
module.
Install the primary PMCspan module (if
used).
Install the secondary PMCspan module
(if used).
Install and connect the MVME2300
module.
Connect a console terminal.
Connect any other optional devices or
equipment you will be using.
1-5
Table 1-3. Start-Up Overview
Refer to ...
Unpacking the MVME2300 Hardware on page 1-7
Preparing the MVME2300 Hardware on page 1-7
Preparing and Installing PMCs on page 1-13
Installing the Primary PMCspan on page 1-15
For more information on optional devices and
equipment, refer to the documentation provided with
that equipment.
Preparing and Installing PMCs on page 1-13
PMC Slots on page 2-6
For additional information on PMCs, refer to the PMC
manuals provided with these cards.
Installing the Primary PMCspan on page 1-15
Installing a Secondary PMCspan on page 1-17
Installing the MVME2300 Module on page 1-19
Installation Considerations on page 1-21
System Console Terminal on page 1-12
DEBUG Port on page 2-5
Appendix B, Connector Pin Assignments
Overview of Start-Up Procedures
1