Section 8
Establishing connection and verifying the IEC 61850 communication
2.1.
3.
Enable IEC 61850-9-2LE (process bus) communication for port CD.
3.1.
There are no settings needed for the IEC 61850-9-2LE communication in the local HMI branch
Station communication. Make sure that the optical fibers are connected correctly.
Communication is enabled whenever the merging unit starts sending data.
8.3

Verifying the communication

To verify that the communication is working a test/analyzing tool, for example ITT600, can be used.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both port AB and CD. Browse in the local HMI to
Main menu/Diagnostics/Communication/Redundant PRP and check that both signals LAN-A-
STATUS and LAN-B-STATUS are shown as
AB or CD. Verify that either signal LAN-A-STATUS or LAN-B-STATUS (depending on which
connection that was removed) are shown as
sure to re-connect the removed connection after completed verification.
62
Enable redundant communication.
Navigate to: Main menu/Configuration/Communication/Ethernet configuration/
PRP:1
Operation , IPAddress and IPMask . Operation must be set to Enabled .
Set values for
The IED will restart after confirmation. Menu items LANAB:1 and LANCD:1 are hidden in
local HMI after restart but are visible in PST where the values for parameter
Duo .
to
Set values for the rear port CD.
Navigate to: Main menu/Configuration/Communication/Ethernet configuration/
LANCD:1
Mode , IPAddress and IPMask . Mode must be set to IEC9-2 .
Set values for
Ok . Remove the optical connection to one of the ports
Error and the that other signal is shown as Ok . Be
1MRK 504 154-UUS B
Mode is set
SEMOD172108-24 v8
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents