Completing The Test - ABB RET670 Commissioning Manual

Transformer protection version 2.1 ansi
Hide thumbs Also See for RET670:
Table of Contents

Advertisement

Section 10
Testing functionality by secondary injection
CB1 52
(SESRSYN 1)
LN1 989
ANSI11000274 V1 EN-US
Figure 45: Objects used in the voltage selection logic
10.10.1.5

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
10.10.2
Apparatus control APC
The apparatus control function consists of four types of function blocks, which are connected in a
delivery-specific way between bays and to the station level. For that reason, test the total function
in a system, that is, either in a complete delivery system as an acceptance test (FAT/SAT) or as
parts of that system.
10.10.3
Voltage control TR1ATCC, TR8ATCC, TCMYLTC, TCLYLTC
Prepare the IED for verification of settings as outlined in section
section
"Preparing for test"
194
CB2 252
(SESRSYN 2)
Line 1
If a block/unblock command is sent from remote to function, while the IED is shut
down, this command will not be recognized after the start up, thus the command
that was sent prior to the shut down is used. In such cases, where there is a
mismatch, the user is advised to make a complete cycle of block/unblock
operations to align the statuses.
in this chapter.
Bus 1
Bus 2
CB3 352
(SESRSYN 3)
LN2 989
Line 2
ANSI11000274.en.v1
1MRK 504 154-UUS B
TestMode setting to Disabled .
"Requirements"
and
Commissioning manual
M2377-1042 v5
M13385-2 v4
SEMOD175185-3 v12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents