16 •
Quick Start

Testing the Process Data Exchange

2.3 Testing the Process Data Exchange
Proper configuration of the Bluetooth
2.2.3) is a prerequisite for successful testing of the process data exchange. The
constant green blinking of LED 2 (top right of Bluetooth
Bluetooth
1. Close the Bluetooth
2. Right click on master and slave, one after the other.
3. Choose Process data in the context menu.
The process data dialog opens so that you can view the raw data.
4. Click with the right mouse button on the word "Input" in the dialog of the
You have the choices Input, Output and Reset. From now on, you can switch
between the displays for input and output data using this menu (see Figure 9).
Figure 9: View of the process data
5. Enter any data in the "Output" dialog:
6. Test whether the input data of the one Bluetooth
®
master and slave connection.
®
master.
in the process image of slave and master beginning with offset + 2 (bytes 0
and 1 are reserved for status information)
rect output data of the second Bluetooth
®
device (see sections 2.2.1 through
parameterization dialog.
®
module.
®
master) indicates a
®
module lead to the cor-
WAGO-I/O-SYSTEM 750