2.2 Product installation

19-inch standard rack installation
PS3016S is designed according to the standard 19-inch rack size, you can easily install to the
rack, the specific installation steps are as follows:
1)
2)
3)

Chapter3 Hardware connection

3.1
RJ45 port connection
Connect the RJ45 port of the switch and the corresponding network device via cables, the
POE power supply function of the switch is default enabled on the downlink port of the
switch, which can be used for IEEE802.3af or IEEE802.3at standards powered devices such
as APs, bridges, and network cameras
Make sure the rack has a good cooling system, or maintain good indoor ventilation;
Make sure the rack is well grounded, the power outlet and switch are within 1.5 meters
Prepare tools for installation
You may need to use a screwdriver during installation, electrostatic wrist strap, fiber optic
cable and other tools to prepare your own
Check rack grounding and stability;
Install the two L-brackets in the accessory on each side of the switch panel and secure
with the screws provided in the accessory
place the switch in an appropriate place in the rack and be supported by the bracket.
Screw the L-shaped bracket to the guide groove fixed on both ends of the rack to ensure
that the switch is stable and horizontally installed on the rack
Note:
Good grounding rack is anti-static equipment, anti-leakage, lightning protection, anti-
jamming important guarantee, so to ensure that the rack ground wire properly installed;
Installation equipment within the rack from the bottom up, to avoid overload
installation;
Avoid placing other heavy objects on switch to avoid accidents;
Ensure heat dissipation and air circulation.