Ventilation; Mounting - REMEHA P 420 Technical Instructions

Fuel oil/gas boilers
Table of Contents

Advertisement

2 Ventilation

The location of air inlets in relation to the high ventilation openings
shall ensure that the air is renewed in the entire volume of the boiler
room.
It is in any case imperative to conform to the local regulations in force.
For mounting instructions, see installation instructions.
8
Warning:
In order to avoid damage to the boilers, it is necessary to prevent the
contamination of combustion air by chlorine and/or fluoride
compounds, which are particularly corrosive.
These compounds are present, for example, in aerosol sprays,
paints, solvents, cleaning products, washing products, detergents,
glues, snow clearing salts, etc.
Therefore:
Do not suck in air evacuated from premises using such
products: hairdressing salons, dry cleaners, industrial premises
(solvents), premises containing refrigeration systems (risk of
refrigerant leakage), etc.
Do not stock such products close to the boilers.
If the boiler and/or peripheral equipment are corroded by such
chloride or fluoride compounds, the contractual guarantee
cannot be applied.

Mounting

Remeha P 420
06/04/06 - 300008441-001-C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents