Start And Adjust The Ram; Start And Adjust The Pump - Graco E-Flo SP D200S Installation And Parts Manual

Supply systems
Table of Contents

Advertisement

Start and Adjust the Ram

1. Turn the disconnect switch (M) OFF.
2. Raise the Ram by opening the main air slider valve
(AA) and setting the ram air regulator (AB) to 40 psi
(0.28 MPa, 2.8 bar).
3. Set the ram director valve handle (AC) to UP and let
the ram rise to its full height.
4. Set the ram director valve handle (AC) to neutral.
5. Lubricate the platen wiper (EB) with grease or other
lubricant compatible with the fluid you will pump.
6. Put a full drum/pail on the ram base and center it
under the platen (D).
7. Remove the drum/pail cover and smooth the sur-
face of the fluid with a straightedge. To prevent air
from being trapped under the platen, scoop fluid
from the center of the pail to the sides, to make the
surface concave.
8. Adjust the drum/pail to be sure it is aligned with the
platen, and remove the platen bleed stick to open
the platen bleed port.
Platen Bleed Stick
EB
Platen Bleed Stick
EB
3A6331C
9. With hands away from the drum/pail and the platen,
push down on the ram director valve (AC) handle,
and lower the ram until the platen rests on the lip of
the drum/pail. Move the ram director valve handle to
the horizontal position (neutral).
10. Lower the ram:
a. Set the ram director valve (AC) to DOWN and
b. Set the ram director valve to neutral, replace the

Start and Adjust the Pump

1. With the disconnect switch (M) OFF, set the ram air
regulator (AB) to about 50 psi (0.35 MPa, 3.5 bar).
Set the ram director valve (AC) to DOWN.
2. Turn the driver disconnect switch (M) ON.
3. Start the pump. See the E-Flo SP Software Instruc-
tions manual for instructions on operating the sys-
tem.
4. Keep the ram director valve (AC) set to DOWN
D60
while the pump is operating.
NOTE: Increase air pressure to the ram if the pump
does not prime properly with more viscous fluids.
Decrease air pressure if fluid is forced out around the
top seal or platen.
D200
continue to lower the ram until fluid appears at
the platen bleed port.
platen bleed stick, and tighten it securely.
Startup
21

Advertisement

Table of Contents
loading

Table of Contents