Preparing the Machine for First Use
wc_tx001875gb.fm
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
21
W.4.CKER
NEUSON

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GPi 3200 and is the answer not in the manual?

Table of Contents