3 Mechanism of QC-S300/-S30
3 - 5 Bin Up Section
1
Bin Up Mechanism of QC-S300
3 - 5 -
(1/2)
Bin Link F
S05
Bin Upper Limit Switch
Detect Plate
Connect Link
S06
Bin Lower Limit Switch
Drive Link
Bearing
Crank
M04
Bin Up Motor
3 - 5 - 1 Bin Up Mechanism of QC-S300
Gate Plate SW
S05
Bin Upper
Limit Switch
Detect Plate
S06
Bin Lower
Limit Switch
Link Mechanism
Fulcrum
Q C - S 3 0 0
0.5
1mm
Switch Installation Position
There is 0.5 to 1 mm space
when the actuator is pressed
by the detect plate.
This screw
connects the
drive link and
the connect
link.
This shaft becomes
the fulcrum.
3-6
51041
30501A1