Download Print this page

GE VAT300 Series Quick Manual page 7

Power protection

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
Chapter 2 Installation and Wiring
2-1 Installation environment
Observe the following points when installing the inverter.
(1) Install the inverter vertically so that the cable lead-in holes face downward.
(2) Make sure that the ambient temperature is –10°C to 50°C.
(3) Avoid installation in the following environment.
Place subject to direct sunlight
Place subject to wind, rain or water
Place with high levels of humidity
Place subject to oil drops
Place where dust, cotton lint or iron chips, etc., are present
Place with high levels of salt
Place with harmful corrosive or explosive gases or fluids are present
Place near sources of vibration such as dollies or press machines
Place where flammable materials are present
Place with high levels of
Places with high levels of magnetic noise
Places where radioactive substances are present
(4) Ensure ventilation space around the inverter. (Refer to Fig. 2-1.)
2-2 Installation and wiring method
Installation and wiring are carried out with the front
cover removed. The operation panel is fixed with the
latches for the operation panel mounting holder, so
the front cover can be removed with the operation
panel attached.
To remove the operation panel, securely hold the
panel with a thumb on the lower side and another
finger on the top side as shown in Fig. 2-2-a, and pull
the panel forward and off. To mount the operation
panel, hold it the top and bottom sides with five
fingers, and press the panel on horizontally. Confirm
that the operation panel is securely fixed with the
latches for the operation panel mounting holder.
Fix the VAT300 at four places when installing. The
lower two installation sections are notched.
The operation panel mounting holder is fixed at the right side and the left side can be raised and
opened as shown in Fig. 2-2-b. In order to make wiring to the control circuit terminal board, remove
the front cover and pull the panel holder forward with slightly pushing its left side to the right direction.
Then the left side of the panel holder will be opened. After closing the panel holder, make sure that the
panel holder is securely fixed to the PCB protection case.
Operation panel
and mounting holder
Control circuit
terminal block
Main circuit
terminal block
Unit installation hole
(Totals four places)
ambient temperature
Front cover
Cooling fan
Pull the panel holder forward
with slightly pushing its left side
to the right direction.
Main body case
Fig.2-2-b
EN-5
VAT300
50mm
50mm
50mm
For N018K5, X030K0 and
For X022K0, X037K0 and
smaller
Fig. 2-1
Fig. 2-2-a
The left side can be opened.
PCB protection case
VAT300
50mm
larger

Advertisement

loading