1.1.1 Selecting the Site of Installation
0002-6395
iR C6800C / iR C6800CN / iR 5800C / iR 5800CN
Be sure that the site of installation satisfies the following requirements; if possible, visit the user's before delivery of
the machine:
- There must be a properly grounded power outlet that is rated as indicated (+/-10%) and that may be used exclusively
by the machine.
- The temperature of the site must be between 15 and 30 deg C and humidity, between 25% and 80%. The machine
may not be installed near a water faucet, water boiler, humidifier, or refrigerator.
- The site must not be near a source of fire or in an area subject to dust or ammonium gas. If the area is exposed to
the direct rays of the sun, the windows must be furnished with curtains.
- The site must be well ventilated. However, the machine must not be installed near the air vent of the room. The
ozone generated by the machine while in operation is not of a level that can harm the health of the individuals around
the machine. Nevertheless, some may find it to be unpleasant, and the room must be ventilated often.
- The machine must be placed on a level floor so that all its feet remain in contact with the floor and the machine will
remain level.
- There must be enough space around the machine. The following diagram shows the minimum dimensions;
whenever possible, be sure there will be more space than indicated:
- Copier [1]
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir c6800cnIr c6800cIr 5800cIr 5800cn

Table of Contents