Recording A Measurement; Enter Into The Measurement Screen - Noraxon Ultium EMG System User Manual

Sensor and receiver
Hide thumbs Also See for Ultium EMG System:
Table of Contents

Advertisement

Ultium EMG Hardware User Manual
standard 2 cm spacing for surface EMG electrodes. The 2-pin lead wire connector can be inserted
either way into the EMG Sensor to facilitate attachment to the surface electrodes.
Noraxon also offers EMG Smart Leads with longer lead wires for special needs.

6.4 Recording a Measurement

Step 1
Within the Home screen, click on the myoMUSCLE
module icon.
Create a New Subject
Select New Configuration
New Configuration
New Configuration
New Configuration. . . .
Step 2
Insert the devices to be used for the measurement
into the configuration by dragging a device in from
the list of A A A A vailable
vailable D D D D evices
vailable
vailable
evices.
evices
evices
Use the sensor list to select or deselect the number
of sensors to be used within the configuration.
While the sensor is selected, assign a name to the
channel by selecting the corresponding muscle on
the 3D Muscle Map
3D Muscle Map or entering the name manually.
3D Muscle Map
3D Muscle Map

6.5 Enter into the Measurement Screen

Continue to the next step by selecting Measure.
Exceptional Functions/Situations (error messages)
Error Message
Error Message
Error Message
Error Message
Could not start all sensors
One or more EMG sensors failed to respond to a start measurement command.
Meaning
Meaning
Check to see if any selected EMG sensors are powered off. This can also happen if
Meaning
Meaning
the subject is more than 40m away from the Ultium Receiver.
Note: The Receiver operates utilizing power provided through the USB connection to a computer.
Certain power saving modes employed by modern computers may disable USB ports when a period of
inactivity is detected. If a USB shutdown occurs the Receiver power indicator will be extinguished, and
the system will fail to respond. It is recommended that the power settings on the computer be checked
and if needed changed to allow continuous operation of all USB ports.
(Rev J)
Measure.
Measure.
Measure.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents