Verifying The Installation - H3C SecPath U200 Series Installation Manual

Unified threat management products
Table of Contents

Advertisement

Figure 23 Connecting a power cord to the UTM device

Verifying the installation

To ensure normal operation of the UTM device, verify the following items before you power on the UTM
device:
There is enough space for heat dissipation around the UTM device.
The grounding cable is securely connected.
The correct power source is used.
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SecPath U200 Series and is the answer not in the manual?

Table of Contents