Checklist Before Installation - H3C SecPath U200 Series Installation Manual

Unified threat management products
Table of Contents

Advertisement

 
Rubber feet (supplied
with UTM device)
 
ESD-preventive wrist
strap (user-supplied)
ESD-preventive gloves
(user-supplied)

Checklist before installation

Table 6 Checklist before installation
Item
Installation site
 
AC power cord (supplied
with UTM device)
Cable tie (user-supplied)
Requirements
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
10% to 95% (noncondensing)
Dust concentration ≤ 3 × 10
Cleanness
No dust on desk within three days
The equipment and floor are well grounded.
The equipment room is dust-proof.
The humidity and temperature are at a proper
level.
Wear an ESD-preventive wrist strap and uniform
when touching a circuit board.
ESD prevention
Place the removed interface module or CF card
on an antistatic workbench, with the face
upward, or put it into an antistatic bag.
Touch only the edges, instead of electronic
components when observing or moving a
removed interface module or CF card.
M6 screw (user-supplied)
Insulation sheath
(user-supplied)
12
Cage nuts (user-supplied)
Ring terminal
(user-supplied)
Result
4
particles/m
3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SecPath U200 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents