Daikin AT09HV2S Service Manual page 19

Removal procedure, 2.5/3.5/5.0 kw class, 9000/13000 btu/h class, indoor unit, inverter/non-inverter, wall mounted type, cooling only, heat pump
Table of Contents

Advertisement

Si04-751
Step
7. Remove the display PCB.
The figure shows the
1
connection of wire
harness for the display
PCB.
2
Unfasten the 3 hooks
and remove the display
PCB.
Disconnect the
3
connector [S27] from
the display PCB.
8. Remove the control PCB.
Unfasten the 2 lower
1
hooks.
Removal Procedure
Procedure
Hook
[S27]
Green
LED 1
Control
PCB
Hook
Display PCB
(R4366)
(R4367)
Green
Yellow
LED 3
LED 2
(R4368)
Hook
(R4369)
Removal of PCBs
Points
The display PCB is located
at the back of the signal
receiver unit.
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AT09HV2S and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents