Daikin AT09HV2S Service Manual page 17

Removal procedure, 2.5/3.5/5.0 kw class, 9000/13000 btu/h class, indoor unit, inverter/non-inverter, wall mounted type, cooling only, heat pump
Table of Contents

Advertisement

Si04-751
Step
3
Slide the electrical box
cover to the left and
remove it.
4
Disconnect the wire
harnesses.
5. Remove the signal
receiver PCB.
Unfasten the 3 hooks
1
and remove the signal
receiver PCB.
Disconnect the
2
connector [S29] from
the signal receiver
PCB.
Removal Procedure
Procedure
Electrical
Hook
box cover
Hook
Hook
Signal receiver PCB
(R4358)
(R4359)
Hook
Hook
(R4361)
[S29]
(R15506)
Removal of PCBs
Points
15

Advertisement

Table of Contents
loading

Table of Contents