AEG AS-IC01-2 Series Installation Instructions Manual page 44

Three-phase grid-tied solar inverter 12 kw to 30 kw
Hide thumbs Also See for AS-IC01-2 Series:
Table of Contents

Advertisement

43
Inverter control
Control item
On/Off control
Restart
Record clear
Restore to fac-
tory
PD201808 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (12-30 kW) V.2-18 EN
LCD display
O n / O f f C t r l
O N
O F F
R e s t a r t
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
C l e a r a l l R e c o r d : S u r e ?
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
R e s t o r e t o F a c t o r y
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
Table 19: Inverter control
Instruction
Control the "On/Off" function through the panel.
Press " " and " " in the control interface to select the oper-
ation. Press "ENT" to confirm the operation and press "ESC"
to return.
Restart the inverter through the panel. All settings and oper-
ation record will be saved.
Press "ENT" to confirm restarting: the inverter will begin to
self-inspect; or press "ESC" to return.
Press "ENT" to confirm clearing all records or press "ESC" to
return.
"Record clear" clears all setting parameters through the
panel, restores the factory settings and saves all history
operation records.
"Restore to factory" clears all setting parameters and history
operation records through the panel and restores the factory
setting. Press "ENT" to confirm the operation or press "ESC"
to return.
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents