Replace The Fuses; Prepare The Instrument To Store, Move, Or Ship - Thermo Scientific QuantStudio 1 Installation, Use And Maintenance Manual

Real-time pcr system
Table of Contents

Advertisement

6
Chapter 6 Maintain the instrument

Prepare the instrument to store, move, or ship

Replace the fuses

Prepare the instrument to store, move, or ship
74
1. Power off and unplug the instrument, then allow it to cool for 15 minutes.
2. Using a flat-head screwdriver, unscrew and remove the fuse holder.
3. Remove each fuse from its fuse holder and inspect it for damage. Carbon
typically coats the inside of failed fuses.
Good
4. Replace each failed fuse.
Note: The voltage and amperage ratings are on the fuse holder.
5. Install the fuse holder back into the instrument.
6. Plug in, then power on the instrument.
The installation is successful if the instrument powers on.
Note: Fuse failure can result from fluctuations in the supplied power to the system.
To prevent further failures, consider installing an electrical protective device, such as a
UPS or a surge protector. If issues with the fuse persist, contact Support.
1. In the home screen, touch
Mode4Next.
2. Open the instrument drawer.
3. Load the packing plate or an empty plate, then close the drawer.
4. Touch Lock Block.
5. Power off the instrument using the power switch on the back of the instrument.
The instrument is now ready to store, move, or ship.
QuantStudio
Settings4Maintenance and Service4Ship Prep
1 Real-Time PCR System Installation, Use, and Maintenance Guide
Failed

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents