Install The Mounting Base - Rockwell Automation Series C Installation Instructions Manual

Point i/o 120v ac input module
Hide thumbs Also See for Series C:
Table of Contents

Advertisement

8 POINT I/O 120V AC Input Module

Install the Mounting Base

To install the mounting base on the DIN rail (Allen-Bradley part number 199-DR1;
46277-3; EN50022), proceed as follows:
ATTENTION: This product is grounded through the DIN rail to chassis ground.
Use zinc plated yellow-chromate steel DIN rail to assure proper grounding. The
use of other DIN rail materials (for example, aluminum or plastic) that can
corrode, oxidize, or are poor conductors, can result in improper or intermittent
grounding. Secure DIN rail to mounting surface approximately every 200 mm
(7.8 in.) and use end-anchors appropriately.
1. Position the mounting base vertically above the installed units (adapter, power
supply or existing module).
2. Slide the mounting base down allowing the interlocking side pieces to engage the
adjacent module or adapter.
3. Press firmly to seat the mounting base on the DIN rail. The mounting base snaps
into place.
Publication 1734-IN010E-EN-E - August 2016
31586

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1734-ia41734-ia2

Table of Contents