Install The Mounting Base - Rockwell Automation C Series Installation Instructions Manual

Point i/o protected sink output module
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Install the Mounting Base

To install the mounting base on the DIN rail, proceed as follows.
POINT I/O is grounded through the DIN rail to chassis
ATTENTION
ground. Use zinc-plated yellow-chromate steel DIN rail to
assure proper grounding. The use of other DIN rail
material (for example, aluminum and plastic) that can
corrode, oxidize, or are poor conductors, can result in
improper or intermittent grounding.
Secure DIN rail to mounting surface approximately every
200 mm (7.8 in.).
1. Position the mounting base vertically above the installed units
(adapter, power supply, or existing module).
2. Slide the mounting base down, allowing the interlocking side
pieces to engage the adjacent module or adapter.
3. Press firmly to seat the mounting base on the DIN rail.
The mounting base snaps into place.
POINT I/O Protected Sink Output Module 7
Slide the mounting base to
allow the interlocking side
pieces to engage the
adjacent module or
adapter.
Publication
1734-IN585C-EN-E - December 2005
31586

Advertisement

Table of Contents
loading

This manual is also suitable for:

1734-ov2e1734-ov4e1734-ov8e

Table of Contents