Built-In Construction Details - DCS BH1 series Installation And User Manual

Professional grill. 36 & 48 inch
Table of Contents

Advertisement

Built-in Construction Details

Standard layout for non-combustible cavity
IMPORTANT!
If installing the grill into a non-combustible enclosure, all combustible construction must still be
outside the 310mm clearance zone. If your island is made of stucco over the top of wooden studs,
the wood cannot be inside the 310mm clearance zone to combustible, even though the stucco is
what is touching the grill area.
Note: vents are to be located
at the left, right and rear of the
enclosure. Minimum size of all
vents is 650mm x 650mm).
CAVITY DIMENSIONS
A
Maximum height of enclosure shell
B
Depth of enclosure shell
C
Minimum depth for hood swing
D
Width of enclosure cavity
E
Height of enclosure cavity
f
Depth to gas supply opening
G
Minimum height to base of vents
IMPORTANT!
 Providing ventilation openings as per the diagrams is mandatory.
 Providing an access opening from the front is mandatory. The opening must be large enough to
allow easy access to the cylinder valve or shut-off valve for the purposes of shutting gas off to the
appliance. If gas supply is via cylinder, the opening must be large enough to allow easy placement
and removal of the cylinder too. A custom door may be fitted over the opening, but the user should
be able to open the door at all times.
INSTALLATION
D
G
C
F
E
Fig. 09
Note: 102 x 102mm opening
for gas supply line.
B
A
Opening for access to gas
cylinder or shut off valve.
BGB-48
MM
902
578
76
1162
257
470
25
BGB-36
MM
902
578
76
876
257
470
25
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgb48-bqarBgb48-bqrBgb36-bqar

Table of Contents