Installing Modules and Cables in the Chassis
This chapter contains the procedures for installing cards and modules into the chassis, after it has been installed
in a rack. It also describes how to connect cables to the ports and RP.
•
•
•
•
•
•
•
Cisco ASR 9901 Router Fixed Ports
The Cisco ASR 9901 Router has 42 fixed-configuration ports that support the following transceivers:
• 16 SFP ports
• 24 SFP+ ports (supports SFP or SFP+)
• 2 QSFP28 ports
Figure 81: Cisco ASR 9901 Fixed Ports
1
2
3
Cisco ASR 9901 Router Fixed Ports, on page 73
Cisco ASR 9001 Router Fixed Ports and Modular Port Adapters, on page 74
Installing and Removing Transceiver Modules, on page 85
Cable Management, on page 85
Connecting Route Processor Cables, on page 92
Connecting Power to the Router, on page 94
Powering on the Router, on page 98
SFP ports (0-7)
SFP/SFP+ ports (8-19)
QSFP28 ports (20-21)
Cisco ASR 9901, ASR 9001, and ASR 9001-S Routers Hardware Installation Guide
3
C H A P T E R
4
SFP/SFP+ ports (22-33)
5
SFP ports (34-41)
73