Testing The Flashboards - E-max BingoConsole Operator's Manual

Advanced pc-based system
Table of Contents

Advertisement

11.7 Testing the Flashboards

To test the hall flashboards, follow the procedure below and refer to figure 11.7
NOTE: Lamp test is performed from the console utilities menu.
1. Power up the outlet strip
2. Power up the Back UPS
3. Power up the Dell CPU
4. Log into the system
5. select Utilities from the Main Menu
6. Touch the Lamp Test button
7. The lamp test screen will appear
8. Touch the Test button. (all flashboard lamps should turn on)
9. Touch the Reset button to turn the test off
Figure 11.7
E-max Gaming Corporation, Inc.
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents